Facilities & resources

IFS ERP System, supporting:

• Sales, Engineering, Production, Quality Assurance, Customer Service, Finance & Administration

SolidWorks® 3D Computer Aided Design (CAD) System,

linked to:

•SolidWorks® PDM (Product Data Management) System,

supported with:

• CAD linked to Computer Aided Manufacturing (CAM) System, allowing the transfer of design details to the CNC machines

Comprehensive manufacturing facility, including:

• 1,200m2 machine shop, equipped with modern CNC, semi-CNC and manual machines

• Matsuura H405 horizontal machining centre

• 800m2 Assembly and Testing facility, containing automated cleaning plant, hydrostatic pressure test rigs, dedicated pressure test rigs for hydraulic equipment and for air, oxygen and other gaseous fluid applications.

• Class 100 Clean Rooms incorporating Class 10 Assembly areas, with Mass Spectrometry (Edwards 5000) gas analysis facility.

Manufacturing Cell, equipped with:

•Abrasive flow machining (AFM), Electro-polishing (EPOL), Electro-chemical de-burring, automated part marking, automated cleaning plant and co-ordinate measuring machine (CMM) inspection

Development Test Facilities, with:

• Functional gas testing to 600 barg (8,700psi), 110nm /min and a temperature range of -65ºC to +120ºC

• Hydraulic testing to 1,000 barg (14,500psi)